What Do SAIDI & SAIFI Actually Mean?

Think of them as the grid's report card. Utilities, regulators, and engineers track these two numbers to measure how well a power network serves its customers.

SAIFI

System Average Interruption Frequency Index

Formula

Total Customer Interruptions ÷ Total Customers Served

Example: If a utility with 500,000 customers records 1,200,000 interruption events in a year — SAIFI = 2.4 outages per customer per year.

SAIDI

System Average Interruption Duration Index

"How many total minutes per year does the average customer sit without power?"

Formula

Total Customer Outage Minutes ÷ Total Customers Served

Example: 72,000,000 outage-minutes across 500,000 customers — SAIDI = 144 minutes (~2.4 hrs) per customer per year.

CAIDI

Customer Average Interruption Duration Index

The third pillar — CAIDI tells you how fast crews restore power once an outage happens. It measures restoration speed independent of frequency.

CAIDI = SAIDI ÷ SAIFI — measured in minutes per event

What Drives Outages — and How to Fix Them

Every SAIDI/SAIFI spike has a root cause. Identifying it is the first step to deploying the right technology.

Common Causes

Tree contact on overhead lines

Transformer or equipment failure

Lightning strikes

Storms, cyclones, ice loading

Animal contact (birds, rodents)

Aging cable insulation failure

Engineering Fixes

Auto Reclosers

SCADA-based fault location

FLISR automation (reroute in seconds)

Sectionalizers — isolate fault zones

Fault Passage Indicators

N-1 redundant transmission paths

Sugs Lloyd Products That Move These Numbers

Our products are engineered specifically to reduce SAIDI and SAIFI for distribution utilities across India and beyond.

Fault Passage Indicators

Pinpoint the exact location of a fault on the network, dramatically cutting the crew time needed to find and fix the problem — directly slashing SAIDI.

↓ SAIDI

Mask group.png
Group 546.png

Auto Reclosers

Automatically disconnect the faulted section and re-energise the healthy network within seconds. Prevents temporary faults from becoming sustained outages.

↓ SAIDI

↓ SAIFI

​Sectionalisers

SF6-insulated self-contained devices that isolate faulted feeder sections automatically, working in coordination with upstream reclosers to restore healthy zones instantly.

↓ SAIDI

Group 549.png
Group 547.png

Outage Management System

Our OMS platform gives operators a real-time view of outage events, affected customers, and restoration progress — enabling faster, smarter response decisions.

↓ SAIDI

↓ SAIFI

Distribution Automation System

Full FLISR capability — automatically faults are located, isolated, and healthy sections restored within seconds without human intervention. The fastest path to low SAIDI.

↓ SAIDI

↓ SAIFI

Group 550.png
Group 548.png

EPC Project Management

Full turnkey construction and upgrade of HT/LT lines and substations — the physical infrastructure backbone that all reliability improvements depend on.

↓ SAIDI

↓ SAIFI

bottom of page